EnglandWest Midlands

Builder website design in Birmingham

Streets of 1930s semis where the same rear extension has been done four hundred times and the homeowner still has no idea what order it happens in. Describe the order and you have already beaten the two quotes they are holding.

Three weeks from go ahead to live, and about ninety minutes of your time: one call, twelve photographs, one read through.

Hand built, not templatedLive in three weeksYou own the domain, files and logins

3 weeks
from go ahead to live
90 minutes
of your time, start to finish
Under 2 sec
page load on 4G

Forty-two B districts, thirty-seven named areas, twelve towns

Jewellery QuarterDigbethEdgbastonAstonNechellsSaltleySutton ColdfieldSolihullWest BromwichSmethwickOldburyHalesowen

Places your site can be built to cover, never a list of builder jobs anyone has done in them.

The awkward bits

The things you say before you say yes

Everyone says they do extensions, how do I look different?

By writing the sequence. Survey, drawings, building control, foundations, the week the kitchen is out of use, handover. Nobody else does it, and it is the only thing that answers the question they are actually asking, which is whether you can run a job rather than lay a brick.

The good enquiries all come from architects

Keep them, and write a second page for the homeowner who has no drawings yet. That person is eighteen months out and worth having early, because the firm that answered their first question is the one who gets the job when the drawings finally exist.

Birmingham is enormous, where do I even aim?

At four suburbs, not at a city. Extensions Harborne, loft conversion Moseley, builder B29. Those searches bring somebody a fifteen minute drive away and have a handful of firms in them. And Sutton Coldfield and Solihull are separate post towns and separate pages.

Sutton Coldfield and Solihull are on my patch too

Then they are their own pages. Sutton Coldfield, Solihull, West Bromwich and Halesowen are separate post towns inside the same B letter, and nobody in any of them reads a page headed Birmingham as being about them. Four short pages beat one that claims everything.

What you get

The pages your site needs

A page per job, never a page per suburb.

Extensions

The sequence of the job, week by week, in your own words.

Loft conversions

A different buyer from an extension, so a different page.

Renovations

Dates and sequence matter more than finished photographs.

Groundwork and foundations

The part nobody photographs and everybody worries about.

Structural alterations

Where building control and a calculation enter the conversation.

Garden rooms and garages

The faster jobs that keep a team busy between the big ones.

What each of these pages has to do

The one question your form must ask

Do you have drawings yet?

It sorts a customer who is ready to book from one who is eighteen months out, and both are worth having.

One thing about Birmingham worth checking

Checkable, like the rest of this page. Here is where we read it.

There is no B22, B39 or B41. B26 and B36 are split between Birmingham and Solihull, B37 and B40 are Solihull outright, and B43 crosses into Sandwell and Walsall — so a Birmingham firm's coverage is a list of numbers, never a boundary.

Read from B postcode area, Wikipedia, 2026-08-18

Beeforge is a small studio working across the UK and Ireland. There is no office in Birmingham and we are not going to pretend otherwise — nothing here says we have worked in the city, only that we build for builders who do.

Straight answers

Questions we get asked most

How much does a website cost for a builder?
Ours come in under the price of a coffee a day and you get the number on the first call. Across the market a template is a few hundred pounds and a written site is several thousand. Whoever you use, ask for the five year total including hosting and changes.
Why is my building company not showing on Google Maps?
Almost always no Google Business Profile, one that was never verified by post or video, a business name and address that does not match your site, or no reviews at all. Fix them in that order. All four are free and all four beat a redesign.

Next step

Tell us your trade and the towns you cover

A straight yes, no, or not yet, within one working day.

Nothing to sign

No twelve month tie in, no exit fee and no notice period. Stop whenever you like and the site stays yours.

It is yours, in writing

Before you pay a penny we tell you who the domain is registered to, where the files sit, who holds the logins, and how to move the site elsewhere.

Your side of it is small

No copy to write and no hosting to work out. Answer questions for about an hour and a half and send twelve decent photos.